Muller Professional Services, Manchester Spring Gardens
CUBED were also awarded the 4th Floor refurbishment within another one of Muller’s office blocks this time in Manchester.
Fitting out a full floor with Armstrong Metal Ceiling System incorporating LED lighting panels. Installing a fully fitted tea prep area, island unit and ceramic brick tiles herringbone pattern to splash back. Creation of a bespoke feature timber wall and baffle system to the entrance ceiling, the luxury carpet tiles to finish the large floor area.
Click on the photos below to enlarge.